top of page

Hurdles

This past week in ISM was normal. The work load was not too much, there was no presentation, there was just a single major grade in my final product proposal. My goal for my final product is to create the prototype of an app redesign. After doing some research, I have realized that the creation of a prototype is the best way for me fulfill my goal of creating an app to some extent within the time constraints of ISM. However, make no mistake, creating the prototype requires a significant amount of work as well. It requires the creation of wireframes as a prerequisite to the prototype. The creation of my final product will be an evolutionary process. With my proposal done, I can now take the idea to my mentor and from there, I will be able to completely flesh it out and then begin the process that I outlined in my calendar as well as in my product proposal. As for the coming week, I have a mentor assessment coming up which is on the basis of a mentor visit. Meeting with my mentor has been quite difficult and I hope that our meetings can start after Spring Break so that we can started on great things.

 
 
 

Comments


bottom of page